Test2

Here is a tentative agenda for the second round of tests.

Tools

Roam phone
Camera
Voltmeter

Tests

Fix the mirror cover 
Open and close mirror cover, listen and watch
Redo HA servo
Raise and lower floor, check interlock
Check Dome pointing
Hit Estop, check interlock
Turn on Great White Spot and check bulbs
Turn on preload, measure voltage
Try MOP
Install updates, reboot Pima 
Get temperature sensors to work

Night tests weather permitting.
Point to anything on the meridian and take an image.
Try to focus.

Notes

If you need to run Owl, you must kill rleach.

Photos

Pima computer
UPS
new camera dewar
drawings (in control cabinet) that have changes and markups

Tasks Index